ProjectLeamouth South Project
ProductW20™ Doors and Screens
ArchitectAllies & Morrison
ClientBallymore Property Group
ContractorD&R Designs

Located in the Tower Hamlets Borough of London, the Leamouth Project by the Ballymore Property Group is a new development located alongside the River Thames. The project plans to include 804 new homes, 2,000 sq m of commercial space, 235 sq m of education floorspace, and a restored Grade II-listed Orchard Dry Dock.

Such a prestigious project required the experience and expertise of a specialist company which is where Crittall came in. D&R Designs installed Crittall windows and doors throughout the prestigious Marketing suite of the London City Island Development, which overlooks the O2 Arena.

Crittalls slimline W20 profiles were installed as windows and doors on the suite, and provided a stunning view of the Thames. David Phillips, Managing Director of D&R Designs said of the project: “The final result was truly amazing, the Crittall products worked perfectly with the style of the building and allowed for lots of light to enter the room. We were even more pleased that the photos did the project justice as that can be hard to do sometimes!”.

Photography is courtesy of Rex Preston Photography.


Share This Page:
Back To Case Studies

From The Same Category

A Luxurious Prospect At New York’s Whitby Hotel

1st February 2017

O’Briens Arts Center – St. Andrews School

1st November 2004

Walsingham House

26th October 2018

100 Queen Street, Glasgow

15th October 2018

Howick Place, Westminster

23rd September 2018

Drake’s, London

23rd September 2018

Bass Library , Yale – CT

1st August 2008

Lidl, Bath

23rd September 2018